Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the genesis domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/zdeqrdzyeix9/public_html/countryplace75703.com/wp-includes/functions.php on line 6114
Long Lake (#3): New Footbridge - Country Place 75703

Long Lake (#3): New Footbridge

The footbridge across the dam on our Long Lake (#3) had rotted out to the point that it was becoming unsafe, so your board put it out for bid and Roman Landscaping was awarded the job. Andrew and his crew have constructed a very solid footbridge which should last another ten years.

Speak Your Mind